Blower door and airtightness in Heinsberg

Blower door Heinsberg: the test measures what was built

A blower door test shows within hours how tight a building really is. It cannot be passed after the fact. It is decided on site, at every joint, every junction and every penetration. That is exactly what MK-AUSBAU works on.

0255075100TEST PRESSURE50Pa
Test pressure
50 pascal
Value
Air change rate n50
Our part
Building the airtight layer
Area
Kreis Heinsberg
Open roof structure with timber rafters and empty bays in a building at shell stage
Title photographLoft at shell stage. This is where it is decided whether the airtight layer will hold.

01The test

What happens during a blower door test

A fan is fitted airtight into a door opening and creates a pressure difference of 50 pascal between the building and the outside air. The volume of air it has to move equals the air passing through every leak in the envelope.

StepWhat happens
01 Preparation

Windows and external doors are closed, internal doors opened, ventilation openings sealed. The building is treated as one single volume of air.

02 Depressurisation

The fan draws air out of the building. Outside air flows in through every fault, and the cold draught becomes noticeable at the junctions.

03 Pressurisation

The direction is reversed. Air is now pushed from inside outwards, which reveals some leaks more clearly than depressurisation does.

04 Evaluation

The air flow at 50 pascal and the internal volume give the air change rate n50, expressed in air changes per hour.

02040506080Test point 50 PaPressure difference in pascalAir flow
leaky envelopetight envelope

NoteThe values come from the test report and describe the state of the building on the day of the measurement.

02Who tests

Who needs a test

Not every building has to be tested. The evidence becomes compulsory as soon as a funding programme or the ventilation design calls for it. Those who test voluntarily usually do so because faults can only be fixed expensively afterwards.

CaseWhy a test is needed
01 New build with funding

Funding programmes regularly require evidence of airtightness as part of the confirmation issued after the work is done.

02 Mechanical ventilation

A ventilation system with heat recovery only works in a tight envelope. Without one, the recovered heat leaves again through the joints.

03 Funded refurbishment

A funded refurbishment also leads to a test as a rule, because the calculated energy demand is otherwise unsupported.

04 Calculated evidence

A more favourable assumption in the energy balance is only permitted where the tightness of the building has actually been tested.

05 Voluntary test

A test at shell stage, before anything is boarded over, is the only chance to reach a fault without taking work apart again.

Air change rate n50 in air changes per hour
tightleaky
Without ventilation system
n50 up to 3.0 per hour
With ventilation system
n50 up to 1.5 per hour
Passive house
n50 up to 0.6 per hour

NoteWhich value applies to your building depends on the method of evidence and on the funding programme. What is binding is always what your own calculation says.

03Leaks

Where a building loses air

Leaks almost never sit in the middle of a surface. They sit where two components meet, where something is led through the envelope, and where somebody opened things up again later.

Roof slope and raftersWhere the vapour control layer meets rafters, ridge and gable wall
Window perimeter jointThe transition between frame and reveal, inside and out
Sockets in the external wallEvery box and every conduit is a route through the airtight layer
Service penetrationsPipes and cables crossing the basement ceiling or an external wall
Junction with the stud frameThe seam between drywall, the structural wall and the floor build up
Skirting and floor junctionThe perimeter edge of the screed and the transition to the wall

NoteThese photographs show building situations, not reference projects.

04Services

What MK-AUSBAU does to the airtight layer

We work on the layer itself: on the membrane, the tape, the perimeter joint and the board over it. That is the work a test result rests on in the end.

ServiceWhat it coversResult
01 Building the airtight layer

Vapour control membrane, dust barrier and taped board materials as one continuous layer, matched to the component and to the moisture and airtightness concept.

A continuous layer
02 Junctions and penetrations

Transitions to masonry, rafters, window frames and the ground slab, together with grommets for pipes and cables.

A tight transition
03 Insulation work

Natural insulation such as straw and conventional materials such as glass wool, always planned together with the moisture and airtightness concept.

A build up that suits
04 Drywall as a protective shell

Stud frame, boarding and filling carried out so that the layer behind it stays undamaged.

An undamaged layer
05 Repairing leaks

Open up, tape properly, close again. Wherever a fault has been named in the report.

A closed fault
06 Site check

A check of the site before the test date, so that obvious faults never make it into the measurement.

A known position

NoteThe measurement itself is not part of what we do. It is carried out by an independent test team.

A few sentences are enough for a first assessment.

Send an enquiry +49 (0) 2452 8607038

05Preparation

How a building is prepared for the test

A test date is not a surprise inspection. What counts on the day is built in the weeks before it and checked in the hours before it.

Empty interior of a building at shell stage with light walls and open door openings
Fig.Completed shell shortly before the interior fit out
StepWhat happensWho acts
01 Agree the state

Which stage of construction is to be tested. At shell stage a fault can still be reached, in a finished house only the result counts.

Client and designer
02 Close the envelope

Windows and external doors shut, internal doors open, shutter boxes and inspection hatches closed.

Site management
03 Prepare the openings

Ventilation outlets, extract ducts, flue connections and drains are prepared so that they do not enter the measurement as leaks.

MK-AUSBAU
04 Walk the building

One last round at the junctions and penetrations. Anything found now still costs almost nothing.

MK-AUSBAU
05 Fix the date

The test is placed within the construction programme, so that no trade opens up again what has just been made tight.

Everyone involved

NoteAnyone running cables after the test changes the result. That is why the date belongs in the programme rather than beside it.

06Findings

When the test is not passed

A value that is too high is not a disaster, it is a list. The test team names where air is moving. Everything after that is craft.

A fault costs minutes at shell stage and a whole day once the fit out is done.
FindingWhat we do
01 Membrane not taped

Overlaps and butt joints are opened, cleaned and permanently bonded with the right tape.

02 Perimeter junction open

The junction to masonry or concrete is made on a sound substrate with adhesive or a purpose made collar.

03 Penetration without a grommet

Pipes and cables are given a proper grommet instead of a wrap of tape.

04 Membrane damaged

Tears and holes are taped over generously or the bay is replaced. Nothing is patched.

05 Fault behind the boarding

The board is opened, the layer is made good and the opening is closed and filled properly again.

NoteOnce the repair is done the building can be tested again. Whoever issues the evidence decides on that.

07The firm

Gloved hand drawing filler across a wall surface during interior fit out
Fig.Filling work on a boarded wall

The firm

MK-AUSBAU is an interior fit out and refurbishment business in Heinsberg. Maxim Kelm has run it since 2016.

The firm comes from drywall and insulation work. Both trades help decide whether an envelope becomes tight, and both are examined by a measurement in the end.

We work in Kreis Heinsberg and the surrounding area. Short distances mean that a fault reported today does not wait until the week after next for an appointment.

We say in advance what we take on and what we do not. The measurement belongs to an independent test team, so that the work and its examination stay apart.

  • One contact from the first enquiry to handover
  • Written quotations that name the build up
  • Dates that fit the construction programme
  • A clean site, every evening
Based in
Heinsberg
Since
2016
Trades
Drywall and insulation

08Area

Where we work

Our focus is Kreis Heinsberg. On this kind of work a short journey mostly means one thing: a date can be moved at short notice when another trade on site needs longer.

Towns we work in

  • Heinsberg
  • Hückelhoven
  • Erkelenz
  • Geilenkirchen
  • Wassenberg
  • Wegberg
  • Übach-Palenberg
  • Gangelt
  • Selfkant
  • Waldfeucht

And beyond

For larger projects we also travel to Mönchengladbach and Aachen. Just tell us where the building is.

NoteThe journey is stated in the quotation and is never charged afterwards.

09Questions

Common questions

What clients most often want to know before the first appointment.

01Does MK-AUSBAU carry out the measurement itself?

No. We build and repair the airtight layer and prepare the building for the appointment. The measurement is carried out by an independent test team with its own equipment.

02When is the best time for a test?

As soon as the airtight layer is finished and still accessible. Before the boarding goes on, a fault can be fixed in minutes; afterwards only by taking work apart.

03How long does a blower door test take?

That depends on the size of the building and how accessible it is. For a detached house half a day is usually allowed, including preparation and leak detection.

04What does a measurement cost?

That is set by the test team, not by us. What we can price is the work on the airtight layer, and for that you get a written quotation naming the build up.

05Does an older building have to reach the same values?

Not necessarily. Which value applies depends on the method of evidence and on the funding programme. A refurbishment is often assessed against a different value than a new build.

06What happens if the value is too high?

The test team locates the leaks and records them. We open the affected places, make the layer good and close them again. The building can then be tested once more.

07Is a vapour barrier enough for airtightness?

Not automatically. What matters is a continuous, properly taped layer. A membrane that is not connected seals nothing and, laid badly, can even do harm.

08Do you work outside Heinsberg as well?

Yes. Our focus is Kreis Heinsberg. For larger projects we also travel to Mönchengladbach and Aachen.

10Enquiry

Send an enquiry

Tell us briefly which building this is about and when it is to be tested. We will come back with an assessment and a proposed date.

Address
Am Diebsweg 17, 52525 Heinsberg
Working area
Kreis Heinsberg

This helps us give you a first answer

  • New build or existing building
  • Stage of construction and planned test date
  • Approximate heated floor area
  • Mechanical ventilation planned or installed
  • Funding programme, if one is running
Your enquiry
You can also reach us directly on +49 (0) 2452 8607038
Call Send an enquiry